title
Resolution approving a Conditional Use Permit to establish a daycare/preschool in the Neighborhood Residential (NR) zone at 4057 N. Mayfair Road, Laci Robbins, applicant
body
WHEREAS Laci Robbins applied for a Conditional Use Permit to establish a day care/preschool in the Neighborhood Residential (NR) zone at 4057 N. Mayfair Road; and
WHEREAS, this request was reviewed and recommended by the City Plan Commission to be necessary for the public convenience at that location; located and proposed to be operated in such manner which will protect the public health, safety, and welfare; and was found to be compatible with surrounding uses;
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Wauwatosa, Wisconsin hereby grants a Conditional Use Permit to Laci Robbins subject to:
1. Hours of operation shall be Monday through Friday, 7:00 a.m. to 6:00 p.m.
2. Design Review Board approval is required for any exterior changes. Architectural supervision, plan review, and all applicable building permits are also required. A final occupancy inspection and approval must be obtained prior to occupancy.
3. Per City Code 13.30.030, any building project in excess of $100,000 shall have the sanitary sewer lateral replaced or inspected and pressure tested per BPW requirements. If the existing sanitary sewer lateral is to be re-used, a televised report of the existing lateral from the building to the City main must be provided to Engineering. If Engineering identifies any defects in the existing lateral, the defects must be corrected and another televised report provided to Engineering to verify results. This requirement must be met prior to final building occupancy.
4. Providing detailed costs of any alterations and/or new construction, as well as income and expense information when requested by the Assessor's office.
5. The project shall be designed, constructed and maintained in full compliance with all applicable national, state and local fire code requirements.
6. Under WMC 24.16.040I., a Conditional Use will lapse and have no further effect eighteen (18) months after it is approved by the Common Council, unless a building permit has been issued, if required; the use or structure has been lawfully established; or unless a different lapse of approval period or point of expiration has been expressly established by the Common Council.
7. Obtaining all other required licenses, permits, and approvals.
By: Plan Commission
recommendation
Recommendation: Approve 4-0