23-90 - 2023 Fiber
• Awaiting railroad permit and work along Mayfair Rd. (City & WE Energies Gas) to clear before fiber can be pulled north.
23-30 - Wauwatosa Bike Share
• Work to resume in fall in coordination with MRMC and the site work that is on-going. Awaiting update from MRMC on status of their work.
Elm Grove Water Main Extension
• Water main work in Elm Grove continues through Summer/Fall 2024.
24-01 - Potter Road & 109th St.
• Water main work on Potter Rd. is complete including the key tie in to the pump station
• Storm sewer work is on-going over the next couple weeks.
• Work on 109th St. will take place in 2025 based on current progress on the project.
24-02 - 116th St. Park
• Mass grading is complete. Topsoil is being spread on the sledding hill.
• All utility work is complete.
• Concrete work and landscaping work is on-going.
• Exterior asphalt path paving is tentatively scheduled for next week.
24-07 - 2024 Street Improvements
• Concrete removal is complete on Sarasota Pl. and Colonial Dr.
• Landscaping was scheduled for last week and into early the week of Sept 16th on Sarasota Pl. and Colonial Dr.
• Pulverizing of the existing pavement was scheduled for mid-week next week with the lower layer of asphalt expected early the week of 9/23.
• Restoration behind the curb will occur following paving of the lower layer of asphalt.
• Electrical on all three streets was scheduled to wrap up late last week.
24-08 - Center St. & Discovery
• Center St. is reopened.
• Work on Discovery Parkway has not yet started.
24-11 - Green Alleys
• Substantially complete, punch list has been issued.
24-19 - 2024 Sidewalk Repair Program
• Sidewalk stone replacement is work continues.
24-24 - Concrete Pavement Repairs
• Wrapping up the last few alleys into early next week and then will review to issue a punch list.
24-51 - Mayfair Rd. Water Main Lining
• Relay work is generally complete and water main cleaning in prep for lining is underway.
• Lining is expected to begin the week of Sept. 23rd.