Legislation Details

File #: 26-1365    Version: 1 Name:
Type: Action Item Status: Agenda Ready
File created: 8/4/2026 In control: Plan Commission
On agenda: 10/12/2026 Final action:
Title: Consideration of a Conditional Use Permit to establish an outdoor storage yard in the Light Industrial (M1) zone at 10901 W. Walnut Road, Patricia Finn, CableCom LLC, applicant
Attachments: 1. Loc Map, 2. Project Description, 3. Public Hearing 9.29.2026
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

title
Consideration of a Conditional Use Permit to establish an outdoor storage yard in the Light Industrial (M1) zone at 10901 W. Walnut Road, Patricia Finn, CableCom LLC, applicant

body

Submitted by:

Art Piñon

Department:

Development

 

A.                     Background/Options 

The applicant is requesting approval of a Conditional Use Permit (CUP) to allow an outdoor storage yard at 10901 W. Walnut Road, located in the Light Industrial (M1) Zoning District.

Historically, the subject property has been used for the outdoor storage of construction-related materials, vehicles, and equipment. The applicant, CableCom LLC, proposes to continue utilizing the site for the outdoor storage of a dumpster, construction vehicles, equipment, and stone materials.

Surrounding land uses include commercial properties to the north, the U.S. Post Office to the south and east, and the City of Wauwatosa Public Works facility to the west. Given the property's industrial zoning and surrounding land uses, the proposed outdoor storage yard is compatible with the character of the area.

The required public hearing for this request was held before the Common Council on September 29, 2026. The applicant spoke in support of the request, and no one appeared or spoke in opposition.

 

B.                     Staff Comments

Planning/Zoning Division

This Conditional Use request supports the goals and objectives outlined in the City of Wauwatosa Comprehensive Plan by supporting local businesses and enhancing the City's tax base (WCP, p. 20).

 

Building Division

Design Review Board approval is required for any exterior changes. Architectural supervision, plan review, and all applicable building permits are also required. A final occupancy inspection and approval must be obtained prior to occupancy.

 

City Assessor’s Office

No concerns.

 

City Clerk’s Office

No comments.

 

Engineering Division

No comments.

 

Fire Department

The Proposed site shall be designed, constructed, and maintained in full compliance with all applicable provisions of the adopted state and local fire prevention, building & life safety codes, as well as local fire department ordinances.

•                     If any flammable or combustible liquids or compressed gases will be stored or placed on the site, obtain the appropriate permit through our office.

 

Health Department

No comments provided.

 

Police Department

No comments provided.

 

C.                     Recommendation

Staff recommends approval subject to:

1.                     Design Review Board approval is required for any exterior changes. Architectural supervision, plan review, and all applicable building permits are also required. A final occupancy inspection and approval must be obtained prior to occupancy.

2.                     Per City Code 13.30.030, any building project in excess of $100,000 shall have the sanitary sewer lateral replaced or inspected and pressure tested per BPW requirements.

3.                     Providing detailed costs of any alterations and/or new construction, as well as income & expense as requested by the Assessor's office.

4.                     The project shall be designed, constructed and maintained in full compliance with all applicable national, state and local fire code requirements.

5.                     Under WMC 24.16.040I., a Conditional Use will lapse and have no further effect eighteen (18) months after it is approved by the Common Council, unless a building permit has been issued (if required); the use or structure has been lawfully established; or unless a different lapse of approval period or point of expiration has been expressly established by the Common Council.

6.                     Obtaining other required licenses, permits, and approvals.