File #: 23-832    Version: 1 Name:
Type: Action Item Status: Passed
File created: 10/12/2023 In control: Plan Commission
On agenda: 11/13/2023 Final action:
Title: Request by Gabriela Prewitt, The Architects Partnership, LTD., for a Major Planned Unit Development (PUD) Amendment at 11111 W. Burleigh Street to construct a bank with drive through (Chase Bank)
Attachments: 1. location map, 2. Project narrative_231011, 3. 2023-0906_Chase Bank_Wauwatosa,WI_Civil, 4. 20231010 Chase Wauwatosa Landscape, 5. Floor Plan, 6. 2023-0921_Parking Exhibit_Chase Bank_Wauwatosa,WI, 7. TG Memo - Chase Bank Wauwatosa_2023-0804, 8. Trash Enclosure, 9. 2023-0905_Firetruck Turning Exhibit - Chase Bank Wauwatosa, 10. Building section, 11. Exterior elevations, 12. Wall sections and details, 13. Roof Plan, 14. Signtech_Brand book_48100R001319_Wauwatosa NB_08.02.23, 15. photometric, 16. lighting
Related files: 23-1359, 24-0058, 23-1057
title
Request by Gabriela Prewitt, The Architects Partnership, LTD., for a Major Planned Unit Development (PUD) Amendment at 11111 W. Burleigh Street to construct a bank with drive through (Chase Bank)
body
Submitted by:
Art Pinon
Department:
Development

A. Background/Options
The applicant is requesting approval of a Major Amendment to a Planned Unit Development (PUD) to develop a freestanding, 3,293 square foot bank with drive-through at the southeast corner of Burleigh Street and N. 112th Street in the Light Industrial and Planned Unit Development (M1/PUD) District. Surrounding land uses include a grocery store to the north (Whole Foods), warehousing and industrial uses to the south and west, and a retail store (Meijer) to the east.
The PUD for the site was approved by the City in May 2013 and permitted development of the Meijer retail store, which currently exists at the site. Because the proposed bank and drive thru are considered a substantial change to the site plan, the project requires a Major Amendment to the PUD.
The proposed bank and drive through will be located at the northwest corner of the site which currently serves as a parking area for the Meijer retail store. Access to the site will be provided from two (2) shared driveways on 112th Street and a right turn in and right turn out driveway on Burleigh Street.
Attached to this report is the applicant's project description and project plans.

B. Staff Comments
Planning/Zoning Division
No development concerns.

A Major PUD Amendment requires a public hearing before the Common Council on December 19, 2023.

Eighteen public notification letters related to the project were sent per City regulations.
Building Division
Design Review Board approval, plan review, and applicable building permits required. Final Occupancy inspections and approval required prior to occupancy. Compliance with sign code required.

City Assessor's Office
Provide detailed costs of any alterations and/or new co...

Click here for full text