Title: Public hearing and consideration of a request by Phillip Aiello of Mandel Group, Inc. for a Conditional Use Permit in the Research Park District and Mayfair Overlay (SP-RP/MAY) zone at 720 N. Mayfair Road to allow a multi-unit residential development
Attachments: 1. 720 N. Mayfair Rd LOC map, 2. 00_Wisconsin Ave - Mayfair Road Project Description, 3. 01_20241106_720 N MAYFAIR_CONDITIONAL APPROVAL SET, 4. 02_20241106_720 N MAYFAIR_VEHICLE TURNING MOVEMENTS & FIRE ACCESS, 5. 03_20241106_720 N MAYFAIR_SITE LIGHTING PLAN, 6. 04_20241106_720 N MAYFAIR_LIGHT FIXTURE CUT SHEETS, 7. 05_Wauwatosa Wisconsin Ave Multifamily Traffic Study_2024-11-04 - Final, 8. 06_Authorization Letter, 9. Lanser Public Affairs Report for 720 N. Mayfair Road, 10. eComments 24-1554
Related files: 24-1737
title
Public hearing and consideration of a request by Phillip Aiello of Mandel Group, Inc. for a Conditional Use Permit in the Research Park District and Mayfair Overlay (SP-RP/MAY) zone at 720 N. Mayfair Road to allow a multi-unit residential development
body
Submitted by:
Art Pi?on
Department:
Development

A. Background/Options
The applicant is requesting approval of a Conditional Use Permit to develop a 4-story, multi-unit residential development on a 3.67 acre property at the northwest corner of N. Mayfair Road and W. Wisconsin Avenue in the Special Purpose - Research Park and Mayfair Overlay (SP-RP/MAY) District. The project site currently serves as a parking area for the Irgens Research Park development.

The project contains 196 residential units with both surface and below-grade parking (275 parking spaces total) as well as long and short-term bike parking. Residential units consist of studio, one-bedroom, and two-bedroom units. Access to the site is proposed from Wisconsin Avenue. An access point is also provided at the north end of the site but is controlled with a gate. Project amenities include courtyard with pool and dog run, club room and kitchen, fitness center, pet spa, and electric vehicle chargers.

In November 2023, the City granted approval of a 4-story multi-unit residential development containing 201 units on the project site. Ultimately, the applicant decided to sell the property and not pursue the development.

Attached to this report is the applicant's project description, project plans, and public outreach summary.

B. Staff Comments
Planning/Zoning Division
The project site is located within the Wauwatosa Life Sciences District Master Plan that encourages high-density residential development.

Twenty-five (25) public notification letters related to the project were sent per City regulations.

Building Division
Applicable building permits required.

City Assessor's Office
Provide detailed costs of any alterations and/or new...