A. Issue
Request by the Engineering Division for approval of plans and specifications for Contract 25-19, Sidewalk Repair Program
B. Background/Options
Engineering has prepared the attached the Sidewalk Repair Program plans and specifications. The 2025 sidewalk repair area, in general, is largely bounded by North Ave to the south, Mayfair Rd to the west, Capitol Dr to the north and Swan Blvd to the east. South of Center St, the project area extends east to N 88th St. The work includes 1,100+ squares, 9 curb ramp reconstructions at various locations.
C. Strategic Plan (Area of Focus)
Priority 2: Public Safety, Goal 2 - Proactively address pedestrian, bicycle and vehicular safety.
Priority 3: Infrastructure, Goal 2 - Ensure the City’s infrastructure supports public health through multi-modal transportation and recreation opportunities.
D. Fiscal Impact
Project has been included in the 2025-2029 Capital Budget.
E. Recommendation
Staff recommends approval of the plans and specifications and authorization be granted to the City Clerk to advertise for bids on Contract 25-19, Sidewalk Repair Program.