Project Updates
body
Submitted by:
Nick Deming, Construction Manager
Department:
Engineering
23-90 - 2023 Fiber
• The contractor is looking to start pulling fiber once the WisDOT permit extension is received.
24-01 - Potter Road & 109th St.
• Grading and curb work are on-going on 109th St.
• The multiuse path construction on Potter has resumed with school no longer in session.
25-01 - Wisconsin Avenue
• 68th St. at Wisconsin is closed to facilitate water and sewer construction. It is expected to be closed through the summer to install utilities and reconstruct the intersection.
• Storm sewer work started and will continue for the next few weeks on 70th St.
25-07 - Watertown Plank Road
• Water main work is underway.
• The outfall channel was cleared and reviewed for areas needing repair.
• Outfall and Storm Sewer work is expected to start as materials arrive in July.
25-08 - Center Street
• Preconstruction meeting was held. Awaiting a schedule and start date from the contractor.
25-19 - 2025 Sidewalk Program
• Sidewalk program work is underway with both ramp reconstruction and replacement of sidewalk.
25-25 - Burleigh St. Path and Asphalt Repair
• A preconstruction meeting is scheduled for the week of 6/23.
Wisconsin Avenue Bridge (WisDOT Led)
• Bridge demolition is complete.
• The new bridge abutments on either side of the creek are being constructed.