Skip to main content
File #: 26-0515    Version: 1 Name:
Type: Resolution-Council Status: Agenda Ready
File created: 3/10/2026 In control: Common Council
On agenda: 3/24/2026 Final action:
Title: Resolution approving a Conditional Use Permit to expand an eating establishment in the Neighborhood Village Trade/North Avenue Overlay (C1/NOR) zone at 6715 W. North Avenue, Mario Balistreri, Cellos Pizzeria LLC., applicant
Related files: 26-0234
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
title
Resolution approving a Conditional Use Permit to expand an eating establishment in the Neighborhood Village Trade/North Avenue Overlay (C1/NOR) zone at 6715 W. North Avenue, Mario Balistreri, Cellos Pizzeria LLC., applicant

body
WHEREAS Mario Balistreri, Cellos Pizzeria LLC., applied for a Conditional Use Permit in the Neighborhood Village Trade/North Avenue Overlay (C1/NOR) zone at 6715 W. North Avenue to expand an eating establishment, and;

WHEREAS, this request was reviewed and recommended by the City Plan Commission to be necessary for the public convenience at that location; located and proposed to be operated in such manner which will protect the public health, safety, and welfare; and was found to be compatible with surrounding uses;

NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Wauwatosa, Wisconsin hereby grants a Conditional Use Permit to Mario Balistreri, Cellos Pizzeria LLC., subject to:
1. Per City Code 13.30.030, any building project in excess of $100,000 shall have the sanitary sewer lateral replaced or inspected and pressure tested per BPW requirements. If the existing sanitary sewer lateral is to be re-used, a televised report of the existing lateral from the building to the City main must be provided to Engineering. If Engineering identifies any defects in the existing lateral, the defects must be corrected and another televised report provided to Engineering to verify results. This requirement must be met prior to final building occupancy.
2. Design Review Board approval is required for any exterior changes. Architectural supervision, plan review, and all applicable building permits are also required. A final occupancy inspection and approval must be obtained prior to occupancy.
3. Per WMC 24.12.040.A.2, roof-mounted mechanical equipment (e.g., air conditioning, heating, cooling, ventilation, exhaust and similar equipment, but not solar panels, wind energy or similar renewable energy devices) over 30 inches in h...

Click here for full text