File #: 26-0393    Version: 1 Name:
Type: Resolution-Council Status: Agenda Ready
File created: 2/18/2026 In control: Common Council
On agenda: 3/24/2026 Final action:
Title: Final Resolution authorizing public improvement for repaving streets and alleys and levying special assessments against benefited properties
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
title
Final Resolution authorizing public improvement for repaving streets and alleys and levying special assessments against benefited properties

body
Submitted by:
Jeni Schroeder, PE
Senior Civil Engineer
Department:
Depart. of Public Works, Engineering

FINAL RESOLUTION

WHEREAS, the Common Council of the City of Wauwatosa, Wisconsin, held a public hearing both in-person and virtually via use of the Zoom platform at 6:30 p.m. Local Time, on the 27th day of January, 2026 for the purpose of hearing all interested persons concerning the preliminary resolution and report of the Board of Public Works on the proposed improvement by repaving of the following streets and alleys.

Street & Location: Perry Court, Maple Terrace to the end of the cul de sac
Aldermanic Dist.: |910| Exist. & (Prop.) Width: 26 ft (26 ft)
Pavement Const. Type: Type A / Asphalt
Assessed Sidewalk work: No

Street & Location: Laurel Court, Maple Terrace to the end of the cul de sac
Aldermanic Dist.: |910| Exist. & (Prop.) Width: 30 ft (26 ft)
Pavement Const. Type: Type A / Asphalt
Assessed Sidewalk work: No

Street & Location: Maple Terrace, N 75th Street to N 76th Street
Aldermanic Dist.: |910| Exist. & (Prop.) Width: 36 ft (34 ft)
Pavement Const. Type: Type C / Asphalt
Assessed Sidewalk work: No

Alley Location: Meinecke Ave - North Ave, N 102nd St to Mayfair Rd
Aldermanic Dist.: |910| Exist. & (Prop.) Width: 20 ft (20 ft)
Pavement Const. Type: Type A / Green
Assessed Sidewalk work: No

Reconstruction: Type "A" (Asph.) or (Conc.) Completely removing existing curb and gutter and existing pavement, placing new concrete curb and gutter (excluding alleys), and asphalt or concrete pavement surface on a new base.
The above repaving type also includes placing necessary water and sewer service pipes and storm sewer and appurtenances; relaying sanitary sewer and storm sewer as required; relocating existing ...

Click here for full text