|
26-1507
| 1 | 1. | | Action Item | Consideration of request of Engineering Division for a 90-day trial to prohibit parking within the stopping sight distance vision triangle along North Avenue at 74th Street, 73rd Street, Lefeber Avenue, 72nd Street, 71st Street, 70th Street, 69th Street, 67th Street, 66th Street, 65th Street, 64th Street, 63rd Street, 62nd Street, and 61st Street | | |
Not available
|
Not available
|
|
26-1542
| 1 | 2. | | Action Item | Consideration of request of Engineering Division to reduce the speed limit from 35 mph to 30 mph along Wisconsin Avenue from North 95th Street to Mayfair Road with the Wisconsin Avenue reconstruction project | | |
Not available
|
Not available
|
|
26-1641
| 1 | 3. | | Report | Consideration of request from the Engineering Division to replace yield control with stop control on the Blanchard Street eastbound approach to 70th Street | | |
Not available
|
Not available
|
|
26-1390
| 1 | 4. | | Action Item | Consideration of proposal for the City to financially assist that request curb painting adjacent to their driveway approaches | | |
Not available
|
Not available
|